From 5-week BOQs to one-day responses.

A sheet metal supplier's playbook on responding to BOQs in record time — using Sourceby's structured submission flow.

Jan 26, 2026 5 min read Chennai, IN
DR
Divya Raman
Estimation Lead u00b7 SheetMaster Pro
Share this blog: All stories
Section 01

The challenge: quoting as a five-week tax

SheetMaster Pro fabricates precision sheet-metal assemblies at ±0.05 mm tolerance. Buyers sent BOQs as PDFs; estimation re-drew quantities, looked up materials, and built a quote document from scratch for every event. A complex BOQ took five weeks to respond to — and slow responses lost awards before the price was even seen.

Section 02

What changed: structured submission, reused data

On Sourceby, BOQs arrive line-structured with materials and quantities attached. SheetMaster's estimation team responds line by line, reusing standard process and costing data instead of rebuilding it per quote.

  • Line-level responses against the buyer's structure
  • Standard costing templates applied per process
  • Clarifications answered on the line, so quotes stop drifting
Section 03

Results: one-day responses, +38% win rate

Response time on complex BOQs fell from five weeks to a single day. Because quotes now arrive early and complete, SheetMaster's win rate rose 38% — they are in the room while buyers are still comparing, not after the shortlist is closed.

Section 04

What to copy

If you quote faster than your competitors, you win events you never used to see the inside of. Build the costing template once, structure every response against the buyer's lines, and measure response time as a KPI — it is the cheapest win-rate lever a supplier has.